Page 5 of 6
Re: Low O2 System Planning
Posted: Sun Jul 31, 2016 9:46 am
by ajk
Re: Low O2 System Planning
Posted: Mon Aug 01, 2016 8:22 pm
by Big Monk
Controller is here:
Re: Low O2 System Planning
Posted: Wed Aug 03, 2016 4:17 pm
by Big Monk
Sight glass and mash filter:
Re: Low O2 System Planning
Posted: Sat Aug 06, 2016 7:51 pm
by Big Monk
Mash cap assembled:
Re: Low O2 System Planning
Posted: Sat Aug 06, 2016 8:18 pm
by Bilsch
Lots of shiny new kit... Looking good.
Re: Low O2 System Planning
Posted: Sat Aug 06, 2016 9:04 pm
by Big Monk
Unfortunately, even with stepping up to a 16 qt. kettle, I will not be able to hard pipe my sight glass.
I'll likely make a small skid with the sight glass attached directly to my pump inlet. I'll affix the pump and sight glass assembly to this skid with cam fittings making incoming and outgoing connections.
This is pretty disappointing as I want to hard pipe it but it is still 100% functional.
Re: Low O2 System Planning
Posted: Sun Aug 07, 2016 2:47 pm
by Big Monk
Kettles assembled:
16 qt. MLT w/ mash cap:
12 qt. BK w/ whirlpool return and chiller:
Re: Low O2 System Planning
Posted: Mon Aug 08, 2016 7:17 pm
by narcout
Re: Low O2 System Planning
Posted: Tue Aug 09, 2016 8:39 am
by Owenbräu
Looking good!
Low O2 System Planning
Posted: Thu Aug 11, 2016 9:21 pm
by Big Monk
FB is in:
Template for BK lid hatch a la The Beerery:
Chinese MPT Triclover fittings are still en route. I'll build the pump skid when they get here. Once that's done the kettles are all set.
Going to be assembling the controller hopefully next week.