Update:
1.) My Auber EZ-boil mash/boil controller is on back order so I am on the waiting list. First purchased = first shipped. Ordered 2 temperature probes from eBay.
2.) Bought a bulk lot of 1/2" NPT lock nuts and o rings. 10 each.
3.) Purchased some inexpensive 12 qt. kettles. Need to determine my final configuration and order fittings soon.
4.) Got some LocLine. 24" of Recirc flow (Orange) and 10" of regular (Blue). My kettles are just under 10" in diameter so I'll have some extra. This was less expensive than doing piece parts.
1.) My Auber EZ-boil mash/boil controller is on back order so I am on the waiting list. First purchased = first shipped. Ordered 2 temperature probes from eBay.
2.) Bought a bulk lot of 1/2" NPT lock nuts and o rings. 10 each.
3.) Purchased some inexpensive 12 qt. kettles. Need to determine my final configuration and order fittings soon.
4.) Got some LocLine. 24" of Recirc flow (Orange) and 10" of regular (Blue). My kettles are just under 10" in diameter so I'll have some extra. This was less expensive than doing piece parts.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
- Big Monk
- Assistant Brewer
- Posts: 282
- Joined: Mon Jun 06, 2016 7:29 am
- Location: New York
Re: Low O2 System Planning
Fittings are now on their way with my false bottom and mash bag to follow in short order.
Once the fittings get here I'll start mounting them to the pots and doing the electrical prep for the Auber setup. That will leave just the mill, ferm fridge and some testing equipment.
Once the fittings get here I'll start mounting them to the pots and doing the electrical prep for the Auber setup. That will leave just the mill, ferm fridge and some testing equipment.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
-
- Apprentice Brewer
- Posts: 145
- Joined: Mon Apr 25, 2016 7:28 pm
- Big Monk
- Assistant Brewer
- Posts: 282
- Joined: Mon Jun 06, 2016 7:29 am
- Location: New York
Re: Low O2 System Planning
Walmart.com
Type "LocLine Corcular flow" for the Orange recirc return line and I believe the blue line and Orange NPT adapter is part of a kit.
Type "LocLine Corcular flow" for the Orange recirc return line and I believe the blue line and Orange NPT adapter is part of a kit.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
- Big Monk
- Assistant Brewer
- Posts: 282
- Joined: Mon Jun 06, 2016 7:29 am
- Location: New York
Re: Low O2 System Planning
Most of my fittings have arrived.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
- Brandon
- German Brewing
- Posts: 553
- Joined: Tue Oct 13, 2015 8:38 pm
- Location: Pennsylvania, USA
- Contact:
Re: Low O2 System Planning
Visit our home at: and join us on Facebook at
- Big Monk
- Assistant Brewer
- Posts: 282
- Joined: Mon Jun 06, 2016 7:29 am
- Location: New York
Re: Low O2 System Planning
Yup. Everyone has been a great help.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
-
- Posts: 12
- Joined: Mon Apr 25, 2016 9:47 pm
Re: Low O2 System Planning
I'm interested in how this comes together. Capital cost per batch is at high krausen.
- Owenbräu
- German Brewing
- Posts: 1196
- Joined: Tue Dec 22, 2015 8:23 pm
Re: Low O2 System Planning
- The best do the basics better -
- Big Monk
- Assistant Brewer
- Posts: 282
- Joined: Mon Jun 06, 2016 7:29 am
- Location: New York
Re: Low O2 System Planning
Sensors are here.
“We are what we repeatedly do. Excellence, therefore, is not an act, but a habit.” Aristotle
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
"Messieurs, c’est les microbes qui auront le dernier mot." Louis Pasteur
Check us out at www.lowoxygenbrewing.com
Who is online
Users browsing this forum: No registered users and 7 guests