Low O2 System Planning
Posted: Wed Jun 29, 2016 12:05 pm
Update:
1.) My Auber EZ-boil mash/boil controller is on back order so I am on the waiting list. First purchased = first shipped. Ordered 2 temperature probes from eBay.
2.) Bought a bulk lot of 1/2" NPT lock nuts and o rings. 10 each.
3.) Purchased some inexpensive 12 qt. kettles. Need to determine my final configuration and order fittings soon.
4.) Got some LocLine. 24" of Recirc flow (Orange) and 10" of regular (Blue). My kettles are just under 10" in diameter so I'll have some extra. This was less expensive than doing piece parts.
1.) My Auber EZ-boil mash/boil controller is on back order so I am on the waiting list. First purchased = first shipped. Ordered 2 temperature probes from eBay.
2.) Bought a bulk lot of 1/2" NPT lock nuts and o rings. 10 each.
3.) Purchased some inexpensive 12 qt. kettles. Need to determine my final configuration and order fittings soon.
4.) Got some LocLine. 24" of Recirc flow (Orange) and 10" of regular (Blue). My kettles are just under 10" in diameter so I'll have some extra. This was less expensive than doing piece parts.